SECTION A - LIST OF DOCUMENTS

THE LIST IS UPDATED PERIODICALLY, IF YOU HAVE SIGNIFICANT EXPERIENCE SEND YOUR FILE IN A .HTML, .HTM, .JPG, OR .GIF FORMAT TOGETHER WITH A BRIEF DESCRIPTION TO THE E-MAIL: virtual workgroup
back to homepage


Item Filename Short Description
A.1 Design review Guideline for the Project Design Review of 3D Model
A.2 pneumatic test Why pneumatic testing lines instead of hydrotest?
A.3 tie in A brief description mechanical tie-ins type in cold and hot tapping
A.4 twart corrosion Causes of wart corrosion under insulation ("Chemical Engineering Progress" - October 1999)
A.5 chloride corrosion Fight chloride corrosion in aqueous systems and suitability of iron-base metals
A.6 Inspection windows Inspection windows on insulation of equipment and pipes
A.7 zdt Lines subjected to ZDT approval
A.8 automatic mto Automatic piping material take off in early stage of project
A.9 hot welding Welding in hot tapping
A.10 bulk in construction CONSTRUCTION OF PIPING BULK MATERIALS: Analysis of the parameters that can modify the curve of construction (feasibility) at site
A.11 PWHT Post Heat Welding Treatment of socket welds by means of torch fire