Item |
Filename |
Short Description
|
A.1
| Design review
| Guideline for the Project Design Review of 3D Model
|
A.2
| pneumatic test
| Why pneumatic testing lines instead of hydrotest?
|
A.3
| tie in
| A brief description mechanical tie-ins type in cold and hot tapping
|
A.4
| twart corrosion
| Causes of wart corrosion under insulation ("Chemical Engineering Progress" - October 1999)
|
A.5
| chloride corrosion
| Fight chloride corrosion in aqueous systems and suitability of iron-base metals
|
A.6
| Inspection windows
| Inspection windows on insulation of equipment and pipes
|
A.7
| zdt
| Lines subjected to ZDT approval
|
A.8
| automatic mto
| Automatic piping material take off in early stage of project
|
A.9
| hot welding
| Welding in hot tapping
|
A.10
| bulk in construction
| CONSTRUCTION OF PIPING BULK MATERIALS: Analysis of the parameters that can modify the curve of construction (feasibility) at site
|
A.11
| PWHT
| Post Heat Welding Treatment of socket welds by means of torch fire
|